Viaterra RTW Series - Hammerhead 75 Universal Motorcycle TailBag

motorizzr

Skip to product information
1 of 19
Regular price Rs. 8,499.00
Regular price Sale price Rs. 8,499.00
Sale Sold out
Taxes included. Shipping calculated at checkout.
Quantity

Built to last:

  • Triple stitch on all joints for improved strength
  • Bar tacked at all stress points for added reinforcement
  • Tough, tear-resistant High Tenacity polyester webbing used all through
  • Nylon thread for all stitching as it has a higher strength to linear density ratio (Tenacity) than polyester thread.

Functional:

  • 100% seam sealed inner liner constructed from fabric rated for 5000mm water pressure
  • External raincover constructed from soft PVC coated fabric for superior waterproofing
  • Soft plush interior lining in gray color for better visibility of packed items

Original & authentic materials:

  • Heavy duty YKK™ (the world's best!) is used across our range - pullers, sliders & tape - for extra durability and smooth operation on all zips. You can check the puller for the embossed “YKK” logo.
  • We use genuine 3M™ Scotchlite™, a pioneer in retroreflective technology based tapes that helps improve visibility under low light conditions so that your safety is enhanced.
  • Imported fittings (YKK™/ Duraflex™) for optimized & long lasting performance
  • Patented Fidlock™ magnetic closure

Capacity:~75 liters

Weight: 2.4 kg

Fabric:

  • Cordura™ 1000D x 1000D Nylon 6,6 outer fabric with PU/WR sourced from Invista authorized factory
  • High Tenacity polyester fabric with PU/WR
  • Polyester risptop with PU/WR
  • Polyester inner lining with antifray coating

Fittings:

  • Patented Fidlock™ magnetic closure
  • Duraflex™ aerospace grade aluminum metal mounting hooks
  • YKK/ Duraflex™ fittings imported from Taiwan/ China

Zippers & Pullers: YKK™ sliders and YKK™ zipper chain, with YKK™ pullers 3M™ Scotchlite™ 8906 silver fabric trim reflective tape (RA=500 cd/lux/m2) YKK™

Webbing: High Tenacity polyester webbing

  • Delivery within 5-7 Working days
View full details